Thursday, October 13, 2011

★★ Finishing Touches: Assembling the Top Case, Testing the Power Supply ★★



K. Assembling the Top Case (Cover) , Finishing Touches, Testing the Power Supply

After all the components were soldered to their respective locations, the final step was to enclose everything with the casing.

So, we drilled holes at the casing for the switch, fuse, selector switch and for the rest of the other parts of the power supply. Then we had to locate their proper places and put them in there. Some relevant parts, including the switch, the fuse, the output of the power supply, along with the selector switch, needed to be soldered, so we did anyway.
Afterwards, we secured the other case on top of the other so as to serve as the power supply’s cover. Then, we screwed the cover case tight – using a screwdriver of course.

And yeay, we’re DONE!!

Oww, wait, we’re still not done.. Will the power supply work? Uurrrghh…..

So, in order for us to check whether the power supply was functioning and good enough, we tested it with a multi-tester. We tested it using the AC meter. Fortunately, everything was okay.

And yeay, we’re DONE!!

Oww, wait, we’re still not done.. We haven’t passed the Checking Part yet. üü


                                         Assembling Top Case




Fuse

Putting the Fuse on
the Power Supply

Putting the Fuse on
the Power Supply

Screwing the Top Case

Screwing the Top Case

Screwing the Top Case

Screwing the Top Case

Screwing the Top Case

Finished Project ★★



Testing the Power Supply




Power Supply with Multi-Tester

Power Supply set for Testing

Testing the Power Supply

Testing the Power Supply

Testing the Power Supply

Testing the Power Supply

Testing the Power Supply

Assembled Power Supply