Phew! Final Judgment
dated October 6, 2011 (Thu)
This was the most awaited part of the project-making because in here, all our projects would be physically tested whether it could withstand the pressure of physical disturbances or whatever. Then, Mam dropped the power supply from Julius’ height; she did it twice because Julius intervened at the first fall. The damage was only a piece from the case which was situated at the transformer’s screw. However, after Mam cut the 12V wire and we tried whether the power supply was still functioning well thru a dynamo, we figured the odds were in our favor. All the rest (i.e. 3V, 4.5V, 6V, and 9V) except the 12V, worked properly.
At the Lab Room:
![]() |
| Checking the Power Supply |
![]() |
| Ma'am about to drop the Power Supply to test its physical endurance |
![]() |
| Cutting of Wire (This wasn't ours but we passed anyway) |
And so, yeay! We made it. We passed..

★★★★★★★★★★★★★★★★★★
PS: Pictures were actually taken the previous meeting (October 4, 2011) which was a Tuesday. We weren't able to ask someone to take pictures of us during the checking part because we kinda' forgot. Haha!!





0 comments:
Post a Comment